Intrepid® 6140 Director Installation and Service Manual
Installation Tasks
Task 18: Set Director Date and Time
Required if management server is used. 2-54
Task 19: Configure the Element Manager Application
Required if management server is used. 2-55
Task 20: Back Up Configuration Data
Required if management server is used. 2-70
Task 21: Cable Fibre Channel Ports
Required. 2-73
Task 22: Configure Zoning (Optional)
Optional - perform task to configure zoning. 2-73
Task 23: Connect Director to a Fabric Element (Optional)
Optional - perform task to connect director to a Fibre
channel fabric.
2-74
Task 24: Register with the McDATA Filecenter
Required. 2-75
Table 2-3 Installation Task Summary (
continued
)
Task Number and Description Required or Optional Page